 REDEVELOPMENT OF GOLD MINE AND PROCESSING PLANT

Rapallo was engaged by our client as the lead EPCM contractor to carry out the feasibility study and execution works to re-establish the a Gold Mining Operations 

Lead EPCM Consultation

i

Project Management

Site Execution

Lead EPCM Contractor

Rapallo was engaged by our client as the lead EPCM contractor to carry out the feasibility study and execution works to re-establish the Gold Mining Operations to the nameplate rating of 750,000tpa following a significant period of closure. Rapallo’s scope included approximately $35M of work. The project and Rapallo’s scope covered the entire site, including:

  • The Processing plant
  • Haul Roads & Airstrip
  • Power Supply & Communications
  • Mine dewatering & Water supply
  • Surface workshop & Camp facilities

Rapallo provided the overall Project Management; Initial inspection and assessment of existing equipment; Cost estimating; Specification, and tendering of vendor equipment; Engineering design and drafting; Management of vendor packages; Supply of general construction labour; and management of subcontractor labour on site.

OUR CLIENTS

LATEST NEWS

Dewatering – Harder Than It Sounds.

Dewatering – Harder Than It Sounds.

Water. The single most important substance on planet earth. We couldn’t live without it. But sometimes we can’t live with it either. Sometimes we need the water gone.   Dewatering.  Have you ever tried to move a large...

Structural Integrity Audits – Why can’t I do them myself?

Structural Integrity Audits – Why can’t I do them myself?

Hello again, in our last article we discussed exactly what benefits you might get out of doing a structural integrity audit. Now this article is going to explain why you should probably make sure this task is completed by an experienced professional. Why You Shouldn’t...

Structural Audits – Why should you do them?

Structural Audits – Why should you do them?

Hello again, in our last article, we discussed exactly what a structural integrity audit is, and now that you know that you might be wondering why exactly you might get one done. Based on our last article you might have already guessed that the answer is to identify...

white arrow down Project - Redevelopment of Gold Mine and Processing Plant 80

WHAT OUR

CLIENTS SAY

GET IN TOUCH

If you have a project you’d like to discuss, please call us on (08) 6279 0900 or complete and submit the form below.

  • This field is for validation purposes and should be left unchanged.