Rapallo was engaged by our client as the lead EPCM contractor to carry out the feasibility study and execution works to re-establish the a Gold Mining Operations to the nameplate rating of 750,000tpa following a significant period of closure. Rapallo’s scope included approximately $35M of work. The project and Rapallo’s scope covered the entire site, including:
- The Processing plant
- Haul roads & Airstrip
- Power supply & Communications
- Mine dewatering & Water supply
- Surface workshop & Camp facilities
Rapallo provided the overall Project Management; Initial inspection and assessment of existing equipment; Cost estimating; Specification, tendering of vendor equipment; Engineering design and drafting; Management of vendor packages; Supply of general construction labour; and management of subcontractor labour on site.