Rapallo was engaged to conduct a pre-feasibility study (PFS) into the infrastructure requirements to support an open pit mine transition to underground workings

k

Project Studies

i

Project Management

Capital/Opex Budgeting

Rapallo was engaged to conduct a pre-feasibility study (PFS) into the infrastructure requirements to support an open pit mine transition to underground workings. The PFS was developed in sufficient detail necessary to achieve project cost estimates. The primary focus areas of the pre-feasibility study included:

Infrastructure & Facilities

  • Engineering design and drafting services to complete the pre-feasibility including:
  • Site layout; Offices; Change Houses; HV & Electrical
  • Workshop; Washdown facility; Refuelling bay; Core farm; and Site services

Electrical Supply & Distribution

  • Engineering design and drafting services to complete the pre-feasibility
    study for electrical LV supply to proposed surface infrastructure and facilities as specified in the study scope of work.

Underground Infrastructure

  • Engineering design and drafting services to complete the pre-feasibility including:
    • UG services; Dewatering; Mine service Water; Compressed air; UG power distribution; Mine communications & UG facilities.

Capital Cost Estimate

  • Engineering, estimating, expediting and costing services to complete the pre-feasibility study for the proposed infrastructure at Invincible mine

Documentation & Reporting

The report provided by Rapallo exceeded expectations and was completed to such a high standard that the client felt comfortable moving the project straight to execution.

OUR CLIENTS

LATEST NEWS

Rapallo Supports “Global Hand Charity Inc

Rapallo Supports “Global Hand Charity Inc

Rapallo has been involved in supporting a charity called “Global Hand Charity Inc”. Global Hand Charity helps to improve the lives of underprivileged people in South-East Asia, some of the many projects that the Global Hand Charity is involved with include: Conducting...

Dewatering Projects in the Resources Industry

Dewatering Projects in the Resources Industry

Introduction At Rapallo Pty Ltd, we pride ourselves on being pioneers in engineering consultation, driving innovation in the resources industry. We understand the unique challenges faced by resource industries and our commitment is to deliver cutting-edge solutions...

Storage Tanks – Repairs and Alterations

Storage Tanks – Repairs and Alterations

This is the last blog in a 5-part series about tanks. If you want to read the first entry about why tanks are important click here, or for the second part about tank design considerations click here, the third part about tank construction and the fourth part about...

WHAT OUR

CLIENTS SAY

GET IN TOUCH

If you have a project you’d like to discuss, please call us on (08) 6279 0900 or complete and submit the form below.

  • This field is for validation purposes and should be left unchanged.